Not later than 90 days after November 15, 2021, the Administrator shall establish an online database to track the operation of the bulk power system in the contiguous 48 States (referred to in this section as the “Dashboard”).
Not later than 1 year after November 15, 2021, the Administrator shall expand the Dashboard to include, to the maximum extent practicable, hourly operating data collected from the electricity balancing authorities that operate the bulk power system in all of the several States, each territory of the United States, and the District of Columbia.
The system established under paragraph (1) shall complement any existing data dissemination efforts of the Administrator that make use of electricity generation data, such as electricity demand by subregion and electricity interchange with directly interconnected balancing authorities.
Not later than 1 year after November 15, 2021, the Administrator shall establish a system to provide to the public timely data on the integration of energy resources into the bulk power system and the electric distribution grids in the United States, and the observed effects of that integration.
Not later than 1 year after November 15, 2021, the Administrator shall establish a system to provide to the public timely data on the operations of load-serving entities in the electricity grids of the United States.