33 CFR § 402.14 - Operational surcharges—after postponements.
prev | next
§ 402.14 Operational surcharges—after postponements.
Item | Column 1
Place in Montreal-Lake Ontario |
Column 2
Period after clearance date |
Column 3
Amount ($) (5 locks) 1 |
---|---|---|---|
(a) | Cape Vincent (downbound) or Cape Saint-Michel (upbound): | ||
(1) If the postponement is for 24 hours | ( |
20,000 | |
( |
40,000 | ||
( |
60,000 | ||
( |
80,000 | ||
(2) If the postponement is for 48 hours | ( |
20,000 | |
( |
40,000 | ||
( |
60,000 | ||
( |
80,000 | ||
(3) If the postponement is for 72 hours | ( |
20,000 | |
( |
40,000 | ||
( |
60,000 | ||
( |
80,000 | ||
(b) | Port, dock or wharf within St. Lambert—Iroquois lock segment: | ||
(1) If the postponement is for 24 hours | ( |
n/a | |
( |
20,000 | ||
( |
40,000 | ||
( |
60,000 | ||
(2) If the postponement is for 48 hours | ( |
n/a | |
( |
20,000 | ||
( |
40,000 | ||
( |
60,000 | ||
(3) If the postponement is for 72 hours or more | ( |
n/a |
1 Prorated on a per-lock basis.
[66 FR 15329, Mar. 16, 2001. Redesignated and amended at 74 FR 10679, Mar. 12, 2009, and further redesignated at 79 FR 13253, Mar. 10, 2014, and at 81 FR 14391, Mar. 17, 2016]